Coverage
What FirstPass checks — and what it does not
Run the review on a package and this is what happens. Every figure is read from the same registers that run the product.
45
in-scope Abu Dhabi code sources
38,356
requirements tracked, each one accounted for
839
drawing-checkable — the ones a drawing can actually show
11
built-in checks on every package, no model involved
How a package is reviewed
Your package
Uploaded as you would submit it
Read sheet by sheet
Text layer first; every value keeps its sheet and place
AI review
Comments a reviewer is likely to raise, on the sheet they came from
Clause checklist
The drawing-checkable clauses for your disciplines, cited
Built-in checks
11 document-integrity checks, no model involved
Your engineer decides
Confirm, dismiss with a reason, or resolve — every item
Report + Register
Pre-Review Report and Cross-Check Register, with the decisions in them
What you receive
Review comments that cite the clause
About nine in ten code comments cite the clause they rest on and point at the sheet. Each is a screening prompt for your engineer to confirm or dismiss — never a compliance verdict.
A clause checklist your engineer works through
839 drawing-checkable requirements in the library; a single-discipline package typically receives a few hundred, each clause-cited. Decisions are recorded under your engineer's name and travel into the report.
Built-in checks, run automatically
11 document-integrity checks on every package with no model involved: drawing-number naming conformity, title-block machine-readability, drawing register versus sheets present, revision consistency across the set and more. They cite no code clause and never claim to.
What is not automatic
No automatic pass/fail code rule today
A rule is switched on one at a time, only after a named engineer has verified it against the printed clause. No deterministic clause-cited rule returns automatic results today, and no page of this site will imply otherwise.The AI code check reads each applicable clause against the drawings and states a result for your engineer to confirm; it is measured and is issued in the Pre-Review Report. As at 20 September 2026, 84% of the clause check's verdicts were correct on inspection, and 79% of the potential non-compliances it flagged were confirmed.
Most of a design manual is not on a drawing
Requirements about reports, approvals, construction, process, permissions or professional judgement live outside the drawing set. Every one is tracked and routed to your engineer — never counted as screened.
Screening is never a statement of compliance
FirstPass predicts what a reviewer is likely to raise and shows the evidence; your engineer decides. Zero findings does not mean full verification, and the report says so on its face.
Your own codes. Project-specific standards or client design criteria can be added to your workspace and enter the same flow — clause-cited prompts to your engineer, same traceability, visible to your organisation only.
The clause-by-clause register behind these figures is maintained continuously; clients can request a walkthrough for their discipline as part of onboarding.